Installation and wiring
Type 8045
1
2
3
5
4
6
FLOW
flow direction
Electrodes
Fig. 8: Installation into the pipe of a 8045 with a G2'' nut
7.4. Installation into the pipe of a
8045 with a clamp connection
In order to ensure a high accuracy of the measurements and
good stability of the „flow zero“ point, install the device into
the processed medium at least 24 H before calibration.
Install the S020 fitting into the pipe taking into account the rec-
ommendations in chap. 7.2.
Install the seal (mark 3 Fig. 9) on the S020 fitting.
Make sure that the polarizing pin (mark 4 Fig. 9) is on the fitting.
Insert the device (mark 1 Fig. 9) into the fitting. Position the
arrow on the side of the device in the direction of the flow: the
totalizers will increment.
Tighten by hand the clamp collar (mark 2 Fig. 9).
Charge the pipe to make sure the installation is tight.
1
4
3
2
flow direction
Fig. 9: Installation into the pipe of a 8045 with a clamp
connection